注意細節是我們做事情要遵守的原則,駕駛自上料混凝土攪拌罐車更是如此,駕駛攪拌車需要做的細節事情:
Attention to details is a principle that we must follow when doing things, especially when driving a self loading concrete mixer truck. The details that need to be done when driving a mixer truck are as follows:
1、隨車帶上減水劑:減水劑是一種在維持混凝土坍落度不變的條件下,能減少拌合用水量的混凝土外加劑,隨車攜帶,能對混凝土進行很好的調節。
1. Carrying water reducing agent with the vehicle: Water reducing agent is a concrete admixture that can reduce the amount of water used for mixing while maintaining the same slump of concrete. It can be carried with the vehicle and can effectively regulate the concrete.
2、回廠檢查罐內水量:每次出車任務完成回到站內的時候,檢查儲水罐內的水量,讓水罐中的水隨時處于滿罐的狀態,以備不時之需。
2. Return to the factory to check the water volume in the tank: When returning to the station after completing the vehicle task, check the water volume in the water storage tank to ensure that the water in the tank is always in a full state, in case of emergency.
3、離廠前檢查混凝土質量:可能會因為原料的不同,每一盤混凝土質量都會有變化。
3. Check the quality of concrete before leaving the factory: There may be changes in the quality of each plate of concrete due to different raw materials.
4、減少車輛行駛時間:混凝土運距一般在直徑30千米范圍以內,出車之前規劃好路線以及車輛通行情況。
4. Reduce vehicle travel time: The concrete transportation distance is generally within a diameter of 30 kilometers, and the route and vehicle traffic conditions should be planned before departure.
5、減少損失先卸料:如果遇到人為因素或者不可抗因素,導致長時間無法卸料的情況,一旦發現混凝土開始凝結,在報備負攪拌責自上料混凝土攪拌罐車防止粘罐的方法人之后立刻進行卸料,以防整個罐體報廢。
5. Reduce losses and unload first: If human factors or uncontrollable factors are encountered, resulting in the inability to unload for a long time, once it is found that the concrete begins to solidify, the person responsible for mixing shall report the method of preventing sticking on the concrete mixing tank truck and immediately unload to prevent the entire tank from being scrapped.
卸料前讓攪拌罐全速運轉一兩分鐘。讓混凝土充分攪拌,必要時可以加一些水,讓混凝土攪拌得更均勻,也方便卸料。卸料不要大意和放料工打好關系。放料時盡量自己看著,免得放料工亂操作放料操作桿,每次罐子正反轉中間位子時盡量停一下,保護減速機,托輪等。與放料工打好關系,卸料時也不要睡的太熟,萬一工人鬧情緒,把你車子放到工地不轉罐子,造成悶罐就麻煩了。
Allow the mixing tank to run at full speed for one or two minutes before unloading. Allow the concrete to be thoroughly mixed, and if necessary, add some water to make the concrete mix more evenly and facilitate unloading. Do not have a careless relationship with the discharge worker when unloading. When discharging, try to watch as much as possible to prevent the discharge worker from operating the discharge lever recklessly. Every time the can is in the middle position of positive and negative rotation, try to stop as much as possible to protect the reducer, support wheel, etc. Establish a good relationship with the unloading worker, and do not sleep too soundly during unloading. In case the worker becomes emotional and leaves your car at the construction site without turning the can, it will cause trouble if the can becomes stuffy.
6、攪拌罐一定要仔細地沖洗干凈。洗罐子時一定要仔細的沖洗干凈,并把水反復的正反轉兩次,再放出來,然后一趟時把水箱的水全部放進罐子,再回到站加水清洗罐子。
6. The mixing tank must be carefully rinsed clean. When washing the can, it is necessary to carefully rinse it thoroughly and repeatedly turn the water forward and backward twice before releasing it. Then, in one pass, all the water from the water tank should be poured into the can and returned to the station to add water to clean the can.
以上是駕駛自上料混凝土攪拌罐車一定要做的事情,而且細節問題要做好。更多相關事項就來我們網站http://www.dbo1084.com咨詢!
The above are the things that must be done when driving a self loading concrete mixing tank truck, and the details must be done well. For more related matters, come to our website http://www.dbo1084.com consulting service